It's here. Our Atomic Dumpster! Let's catch up, shall we? This week was a transitional time from demo, to framing. Less deconstruction, and more construction. Adam brought in his carpenter, Mike. Adam and Mike have been at it all week and are pounding and sawing as I write this (those are photos for the next blog).
The old floor's been pulled out, along with a lot of other fluff and stuff. New floor joists are down along with some patchwork in the old subfloor. The crawlspace got a new entry into the basement proper with a BIG SAW. With DOUBLE blades. Probably like the one in the horror movie of the same name. I don't know, I couldn't watch that one. See photos.
Lot's of new photos here. Interior shots, action shots, and one of Adam towering over the project like (the Project Manager he is) a modern day Colossus. This should appease everyone for a few days.
Next week, an update meeting, more framing, more cool photos, and who knows what else.




















Wow, they really know ho to demo! Love the Atomic Green dumpster.
ReplyDeleteJB and Carter